Site search for a data centre: power, grid access and siting criteria.

A study of the best location for a neocloud data centre, starting from access to power.

Who worked on it

InvestorTechnologist

Plan Libre approved case-page drawing, 12 October 2026. Source: handoff/assets/case-data-centre-site-page.svg. Source SHA-256: 7678afecc761cc1e920a2fdbaf2f3c84e5d0ed4f38e894dd26f87e5a4b9a992c.
The grid first: power lines and nodes, the nodes with large published capacity highlighted, and the twelve location tracks.

In figures

12
location tracks across Switzerland
5
conditions every site must meet
12 MW
at the meter for 10 MW of computing
105 GWh
a year at full load

Power first

For a data centre, land is easy and power is not. The study started from the grid’s published capacity at each node, then looked for land nearby.

Five conditions on the same parcel

A site moves forward only when one parcel has all five: land that can be secured, a power connection that can be delivered, a zoning that allows the use, cooling and environmental clearance, and two independent fibre routes.

What came out

The twelve tracks, ranked as the order in which to call the utilities and the landowners, with existing data centres as the benchmark, and the documents each site must produce before anyone pays for land: a signed connection study with capacity, voltage, date and cost.

Land to assess for power-hungry use?Tell us about it

Next: 001 Reinach

Tell us about the building or the task.

hello@planlibre.ch

Or write to us here.

We use what you send only to reply to you. See the privacy notice.